A revolutionary breakthrough in cold-pour crack sealant technology. Meets and exceeds the low temperature flexibility requirements of ASTM D3405 and ASTM D6690 Type II.
Application:
1. Clean dust and dirt from cracks.
2. Apply Lastek 3405 so material forms a bead slightly above pavement surface.
3. Material will dry in 2 to 12 hours depending on weather conditions and depth and width of cracks. Complete material cure through will require additional time.
Coverage: Typical coverage of Lastek CP-3405 is 75-150 feet of cracks depending on depth and width of crack.
Weather Requirements: Temperature shall be above 50F during application and for a period of 24 hours after application. Do not apply when rain is imminent or forecast within a 24-hour period.